Friday, April 15, 2011

rotate 360degree garden umbrella

rattan furniture
1)Sturdy aluminum frame with powder coated
2)UV-stabilized resin rattan
3)outdoor furniture
2011 Perfect Outdoor Aluminum PE Rattan furniture



Name:.
outdoor furniture, rattan outdoor furniture,garden furniture,rattan chair,poly rattan furniture,mesh metal outdoor furniture, bedroom furniture,wicker furniture,
1 rattan: PE rattan with aluminum frame, PE rattan water and fire proof
2 frame constructure:sturdy,strong and ligh weight with good powder coating aluminum frame,never rust, the surface is treated with powder coated and oxidation and sensational fastness.
3 color and size are optional,it also can be according to the design and requirement of customers.
4 Cushion::easily removable cushion and cover with high desity foam
5 it's suitable for you to be used in indoor house and outdoor place,to feel comfortable.
6 three to five years gurantee use.
7 this items of the constructure is very strong and light weight,also very conmfortable
8 water and UV resistant synthetical rattan,can be exposed in all weather elements.UV-resistance SGS tested.
9 the design are good to save the container space,so it could save the shipment cost.
10 this style are worthy and have big loadabity,also the price is cheap


Packing(standard export packaging):
1) craft paper and plastic leather protecting,EPE foam protecting packaging for glass and wood case packaging as well.
2) outer with carton

Material:

1. Frame:1.2mm thickness top grade aluminum tube with powder coated

2. Body:SGS tested synthetic PE rattan


3. Cushion:326-360g/m2 polyester waterproof fabric within high density foam

4. Table top:8mm clear tempered glass
Feature:
1)You can have your own size
2) Aluminium Frame ,powder coated finish,high quality
3) Handly Finished with PE Rattan ,rattan color can be choosed.We normally guarantee the rattan 2 years.
4)Fashional and Comfortable Design,you will enjoy yourself when you are having dinner or drinking or relaxing.
5High quality.Every weaving part ,every material we choosed,every joined part of the tube are strictly controlled by our factory's QC.

the delivery time:
1) its subject to your specific order quantity,normally is 25days
2) the delivery time is depends on what kinds of products you ordered

Terms of payment by T/Tor irrevocable letter of credit at sight:
1) 30% deposit down before production
2) balance paid against the copy bill of lading
Update Date:2011-10-19 04:15:11

No comments:

Post a Comment